Linha de revestimento de garrafa de vidro para atualização de reposição de fábrica
March 23, 2026
Pela Equipe Geetech
Categoria: linha de revestimento em alta temperatura
Geetech retrofit upgrade program enhances existing coating lines with minimal downtime. We integrate dual brush and electrostatic dust removal, IR preheating, additional spray booths, and a three-zone oven at 120-200°C into your current conveyor system. Control system upgrades to PLC with HMI recipes w

hile retaining existing loading and unloading infrastructure. Cost-effective quality improvement.
Process Flow:
Existing Load - Add Brush Dust 1 - Add Brush Dust 2 - Add Electrostatic Dust - Spray 1 - Add IR Preheat - Spray 2 - Spray 3 - Add Oven 1 - Add Oven 2 - Add Oven 3 - Cooling - Existing Unlo

ad
Useful Information:
No full line purchase needed. 120-200°C upgrade. Retains floor space. 7 to 10 days installation. Minimal downtime.
Why Choose Geetech:
- Retrofit engineering specialists
- Minimal production downtime
- Existing line reuse for cost savings
- 10+ years of technical support