UV Curing Spray Booth для решения PVD Machine Integration
This integration solution links the spray booth's unloading zone to the PVD machine's load lock via a shared conveyor system or robotic transfer. After UV curing, parts undergo a brief cooling period (30–60 seconds) to stabilize temperature before entering the vacuum environment. A PLC tracks each part's ID, automatically switching PVD recipes based on the specific part type, ensuring process consistency.
5 критических критериев выбора решения:
1. Exhaust Balance: Prevent pressure fluctuations in the PVD chamber.
2. Load Locks: Act as airlocks to maintain vacuum integrity.
3. Conveyor Sync: Align pitch and speed across all integrated zones.
4. Cooling Duration: Prevent thermal off-gassing in the vacuum.
5. Communication: Standardize protocols (e.g., Profinet, Modbus) between systems.
Geetech (Dongguan Geetech Electrical-Mechanical Equipment Co., Ltd.) specializes in this integration, wiring spray booths, UV tunnels, and PVD chambers to a single Siemens or OMRON PLC. This unified control architecture eliminates communication gaps and allows for centralized monitoring of booth temperature, UV dose, and chamber pressure.
Почему выбирают решения Geetech:
1. Единый интерфейс HMI управляет всем рабочим процессом от распыления до PVD.
2. Заказные конструкции шлюзовых камер сокращают время цикла между процессами.
3. Robust mechanical interfaces prevent part misalignment during transfer.
4. Встроенные предохранительные блокировки защищают операторов и оборудование.
5. Управление проектом «под ключ» от проектирования до пусконаладки на объекте.